Provision of town planning consulting services for a new smallgoods manufacturing facility having a total floor area in excess of 4.2 hectares. Services included strategic due diligence ,advice during site selection and acquisition, preparation and submission of development applications and advocacy for the client in relation to development constraints.
Development applications included a section 242 Preliminary Approval overriding the Planning Scheme, preparation of a Structure Plan, Material Change of Use Environmentally Relevant Activities and Operational Works.
Aaron Sweet was involved in coordinating a multi-disciplinary team included environmental, civil engineering, mechanical design and architectural consultants. The project also involved high level discussions on the provision of trunk infrastructure to the site, which had insufficient capacity to cater for the proposed development.