• 1300 017 540
  • office@consultplanning.com.au
Linkedin Facebook X-twitter Instagram
  • Home
  • About
    • Director
    • FAQs
    • Client Reviews
    • Privacy Policy
  • Services
    • Property Subdivisions
      • Subdivision Costs
      • Subdivision Restrictions
      • Subdivision Process
    • Development Applications
      • Development Application Process
    • RiskSMART Applications
    • Statutory Applications and Permits
    • Due Diligence
    • Environmentally Relevant Activities
    • Advocacy
    • Town Planning
  • Projects
  • Articles
  • Enquiries
  • Home
  • About
    • Director
    • FAQs
    • Client Reviews
    • Privacy Policy
  • Services
    • Property Subdivisions
      • Subdivision Costs
      • Subdivision Restrictions
      • Subdivision Process
    • Development Applications
      • Development Application Process
    • RiskSMART Applications
    • Statutory Applications and Permits
    • Due Diligence
    • Environmentally Relevant Activities
    • Advocacy
    • Town Planning
  • Projects
  • Articles
  • Enquiries
Back to all

What is a combined drain?

  • March 5, 2020

During the 1930s, reticulated sewerage systems were installed on a budget with combined drains servicing up to three homes commonly installed. That means allotments in many of Brisbane’s pre-war inner city suburbs may have this type of drain, being a shared connection to the sewer. This means each allotment doesn’t have its own sewer connection directly from the sewer main.

So how does being on a combined drain affect you? If you are planning to renovate your home and it’s connected via a combined drain, you could be restricted to no increase or only a small increase in the number of plumbing fixtures (i.e. a toilet, sink, bath, tap or shower). In some cases, you must be taken off a combined drain and required to establish a new, separate connection. If you need to come off and abandon the combined drain and extend the sewer main you will require the approval of the other property owners.

If you are looking to subdivide your land, and you are currently connected to a combined drain, you will need all affected property owners to consent to works through their property. For a subdivision all lots must have a sewer connection from a sewer main so where there is a combined drain an extension to the sewer main is required. If this is not possible due to inability to obtain consent from neighbours, you will not be able to subdivide the site.

An engineer can help you review the property’s sewer connection and the impacts your plans might have as well as estimate costs of required works.

Wilkinson Shaw & Associates’ Principal Engineer Kym Wilkinson says that an engineering review of any proposed subdivision is always recommended as part of the due diligence process to identify the constraints that might apply.

Disclaimer: While every effort has been made to provide accurate information, Consult Planning does not guarantee that this blog article is free from errors or omissions or is suitable for your intended use. Requirements and standards frequently change so every individual proposal should be thoroughly investigated.

Previous
Next

You might also enjoy

Code Versus Impact Assessment in Queensland
Code Versus Impact Assessment in Queensland

Understand code versus impact assessment in Queensland, what each pathway means for your development application, timing, risk and approval strategy.

How to Check Property Zoning in Queensland
How to Check Property Zoning in Queensland

Learn how to check property zoning in Queensland, read the planning controls that apply, and spot approval risks before you buy, build or subdivide safely.

How Early Planning Strategy De-Risks Industrial Development: BDW Brendale

How Early Planning Strategy De-Risks Industrial Development: Lessons from BDW

Environmentally Relevant Activity Permit Queensland
Environmentally Relevant Activity Permits Queensland

Need an environmentally relevant activity permit Queensland? Practical advice on environmental authorities, applications, conditions and approval risks

Property Subdivision in Queensland: Start Right

Property subdivision in Queensland: assess zoning, lot size, servicing and approvals early to protect your budget, timing and development potential.

Town Planners Brisbane Property Owners Can Rely On
Town Planners Brisbane Property Owners Can Rely On

Town Planners Brisbane property owners trust can clarify zoning, manage development applications and reduce costly approval delays before work begins.

All Categories
  • Development approvals
  • Development types
  • Due Diligence
  • Town planning

Contact Us Us Now

We provide attentive service and the results you expect from a premier town planning consultancy.

Contact Now

We provide attentive service and the results you expect from a premier town planning consultancy.

Call Now
Get a free quote
logo_colour
PIA Registered Planner

Quick Links

  • About Consult Planning
  • FAQs
  • Services
  • Projects
  • Articles
  • Client reviews
  • Get in touch

Contact Us

  • office@consultplanning.com.au
  • 1300 017 540
  • PO Box 807
    New Farm QLD 4005
Linkedin Facebook X-twitter Instagram
  • Privacy Policy

© Consult Planning Pty Ltd